PG&E press release Dec. 27, 2016
REDDING, Calif.—Pacific Gas and Electric Company (PG&E) will increase water flows on the Pit River below the Lake Britton Dam from early January through mid-April of 2017.
Recreationalists in or near the river are encouraged to use extra caution during the higher flows.
The higher flows are necessary so PG&E can dewater the tunnel which delivers water from Lake Britton to the Pit 3 Powerhouse. PG&E will then inspect the tunnel and perform minor maintenance.
With no water being diverted through the tunnel starting January 2, Lake Britton Dam will spill. Flows in the Pit 3 Reach will increase from about 300 cubic feet per second (cfs) to about 2,900 cfs.
Flows should return to normal seasonal flows on or before April 16 when water flows resume through the tunnel.
The Pit 3 Reach is the 4.5-mile portion of the Pit River in the Lassen National Forest between PG&E’s Lake Britton Dam and the Pit 3 Powerhouse.
PG&E is posting signage about the higher flows along the Pit River Road.
About PG&E
Pacific Gas and Electric Company, a subsidiary of PG&E Corporation (NYSE:PCG), is one of the largest combined natural gas and electric energy companies in the United States. Based in San Francisco, with more than 20,000 employees, the company delivers some of the nation’s cleanest energy to nearly 16 million people in Northern and Central California. For more information, visit www.pge.com/ and pge.com/news.